Purchase of hydrogen generators
PROTON ENERGY SYSTEM
22 records totalling $8,110,353.28 CAD, from official Government of Canada open data.
Embed this chart
6 records here have a warning sign
- No competition 5
- Only one bid 1
- Cost at least doubled 2
A warning sign is a reason to look closer, not proof that someone did something wrong. What are the warning signs?
Names on this page
The source files have no identifier for a recipient, and departments write the same name in different ways. This page puts together the records with these names. They differ only in letter case, accents, punctuation, "&" and "and", an article at the start, the legal form at the end (Inc., Ltd., LLP), or the French half of a name in two languages. How names are matched
- PROTON ENERGY SYSTEM 21 records
- Proton Energy System 1 record
By department
| Environment and Climate Change Canada | $8,110,353 | 22 records |
Records
Original Amount $0.00
Original Amount $0.00Training on operation and maintenance of hydrogen generator
Original Amount $10521.41This contract includes one or more amendments.
Original Amount $10018.06Amendment to previously disclosed contract.