supports small and medium-sized territorial businesses operating in one or more of the territories, and which are currently, and expect to continue, operating at a loss as a direct result of economic...
Federal spending by Canadian Northern Economic Development Agency
1,967 records totalling $574,134,443.25 CAD, from official Government of Canada open data.
Embed this chart
Where the money flows
Contracting
$4.7M
across 128 contracts over $10k
59.9%
of contract dollars awarded without competition (93 contracts)
98.2%
of contracts with known bid counts received one bid or fewer (56 reported)
"Without competition" counts solicitation codes TN (non-competitive) and AC (Advance Contract Award Notice). Non-competitive awards are legal and sometimes required; the rate is context, not a judgment.
Planned vs. actual spending
What Parliament authorised this organization to spend versus what it actually spent, across all its votes. Source: Public Accounts of Canada (via GC InfoBase). This covers the organization's entire budget, not just the grants and contracts listed below.
| Fiscal year | Authorised | Spent | Used |
|---|---|---|---|
| 2024-2025 | $81,347,545 | $80,976,370 | 99.5% |
| 2023-2024 | $88,793,848 | $87,358,298 | 98.4% |
| 2022-2023 | $108,741,194 | $105,077,343 | 96.6% |
| 2021-2022 | $91,960,963 | $88,371,514 | 96.1% |
| 2020-2021 | $123,051,655 | $101,219,284 | 82.3% |
| 2019-2020 | $68,522,899 | $67,162,468 | 98.0% |
| 2018-2019 | $50,814,741 | $45,823,015 | 90.2% |
| 2017-2018 | $55,506,700 | $54,420,053 | 98.0% |
| 2016-2017 | $55,823,517 | $53,639,049 | 96.1% |
| 2015-2016 | $51,375,862 | $46,948,420 | 91.4% |
Did it deliver? (2024-2025 results report)
Every department sets measurable performance targets and reports against them. Source: Departmental Results Reports via GC InfoBase — the department's own self-reported scorecard.
6
of 11 targets met
2
targets not met
3
not yet measurable or unavailable
See missed targets
-
% of environmental assessments in the Territories that are completed within the scheduled time frame
Target: — · Actual: 93.0
-
Percentage of environmental assessments in the Territories that are completed within the scheduled time frame.
Target: — · Actual: 93.0
supports small and medium-sized territorial businesses operating in one or more of the territories, and which are currently, and expect to continue, operating at a loss as a direct result of economic...
supports small and medium-sized territorial businesses operating in one or more of the territories, and which are currently, and expect to continue, operating at a loss as a direct result of economic...
supports small and medium-sized territorial businesses operating in one or more of the territories, and which are currently, and expect to continue, operating at a loss as a direct result of economic...
supports small and medium-sized territorial businesses operating in one or more of the territories, and which are currently, and expect to continue, operating at a loss as a direct result of economic...
Nunafab Corp will establish an assembly facility in Cambridge Bay that utilizes innovative building technology to produce affordable and high-quality housing.
A Nicer Motel is receiving a repayable contribution for a 3-year project to enhance its accommodation capacity in Watson Lake.
5140 Nunavut Ltd. / Qillaq Innovations(QI) will carry out a three-year project to expand their business opportunities by exploring a new private housing market
ArchTech will conduct a two year project to build a pre-fabricated modular housing facility in the community of Baker Lake, Nunavut.
Porcupine Enterprises will design and build a mechanical workshop in the Vuntut Gwitchin First Nation (VGFN) community of Old Crow. Project activities are to include the scoping design and constructi...
supports small and medium-sized territorial businesses operating in one or more of the territories, and which are currently, and expect to continue, operating at a loss as a direct result of economic...
The Government of the Northwest Territories Department of Industry, Tourism and Investment (GNWT-ITI) is receiving $600,000.00 to complete a one-year project to complete a high-resolution airborne geo...
White River First Nation (WRFN) will co-develop a Consultation Framework with the Government of Canada, via the Northern Projects Management Office (NPMO), related to the environmental and socio-econo...
Lutsel K'e Co-operative Limited (locally known as the Snowdrift Co-operative Limited) will build a new 3,600 sq. ft. retail store in efforts to enhance products and services to meet the needs of the c...
The Sha Shaw Corporation (SSC) undertake preconstruction planning for the eventual development of a 3-storey multi-purpose building in Haines Junction on the traditional territory of the Champagne and...
Hay River Heavy Truck Sales Ltd. will purchase a new CNC Plate Roller to expand their current offerings. Hay River Heavy Truck Sales Ltd. is a heavy truck dealership and tank manufacturer for truck-mo...
The Government of the Northwest Territories will analyze the entire territory for potential locations where CO2 could be sequestered as part of the potential development of natural gas projects in the...
The Recipient, the Tłı̨ chǫ Government, will undertake a three-year project that will support economic development, Indigenous businesses and entrepreneurs in the four Tłı̨ chǫ communities. The projec...
Hay River Heavy Truck Sales Ltd. will purchase a new CNC Plate Roller to expand their current offerings.
Arctic Kingdom Wilderness Holdings Inc will undertake 3 separate segments of upgrades to their utility systems.
The Tłı̨chǫ Investment Corporation will purchase a solar power generation and storage unit which will be initially installed at the Columac Mine Site to allow the proponent to sell a renewable energy...
The Klondike Visitors Association is receiving funding to implement a two year “Accessible Dawson” pilot project, aiming to support tourism market expansion through targeted infrastructure developmen...
The Selkirk Development Corporation (SDC) will expand upon stage 1 of the Minto Resorts Revitalization project and will complete construction and electric work upgrades to elevate the level of service...
Mésdzih Eskiye Designs will undertake business expansion, mentorship, and participation at regional and national Indigenous fashion shows.
Caribou RV Park will construct two new year-round cabin accommodations, out of pre-manufactured geodesic domes at their current location along with the required electric infrastructure.