Federal spending by Correctional Service of Canada
325 records totalling $61,492,593.21 CAD, from official Government of Canada open data.
Embed this chart
Where the money flows
Planned vs. actual spending
What Parliament authorised this organization to spend versus what it actually spent, across all its votes. Source: Public Accounts of Canada (via GC InfoBase). This covers the organization's entire budget, not just the grants and contracts listed below.
| Fiscal year | Authorised | Spent | Used |
|---|---|---|---|
| 2024-2025 | $3,895,473,587 | $3,600,517,416 | 92.4% |
| 2023-2024 | $3,698,106,682 | $3,374,961,817 | 91.3% |
| 2022-2023 | $3,332,159,663 | $3,015,436,813 | 90.5% |
| 2021-2022 | $3,249,029,072 | $2,909,923,253 | 89.6% |
| 2020-2021 | $3,208,806,895 | $2,931,216,086 | 91.3% |
| 2019-2020 | $2,741,390,747 | $2,652,821,435 | 96.8% |
| 2018-2019 | $2,639,659,335 | $2,589,320,065 | 98.1% |
| 2017-2018 | $2,747,867,816 | $2,628,111,980 | 95.6% |
| 2016-2017 | $2,471,677,134 | $2,362,804,401 | 95.6% |
| 2015-2016 | $2,457,368,490 | $2,357,784,645 | 95.9% |
Did it deliver? (2024-2025 results report)
Every department sets measurable performance targets and reports against them. Source: Departmental Results Reports via GC InfoBase — the department's own self-reported scorecard.
51
of 76 targets met
21
targets not met
4
not yet measurable or unavailable
See missed targets
-
The percentage of offenders with a completed review of their health care needs prior to release
Target: — · Actual: 90.1
-
Percentage of offenders with a residency requirement successfully transitioning out of residency (no revocation, charge or conviction)
Target: — · Actual: 57.7
-
Rate of escapes from federal correctional institutions and Section 81 Healing Lodges per 1,000 offenders (Objective: Zero)
Target: Maximum tolerated value · Actual: 1.28
-
Of the offenders with an identified need for employment in the community, the percentage who secure such employment prior to sentence expiry date
Target: — · Actual: 70.9
-
Percentage of employable time spent employed, for offenders under community supervision
Target: — · Actual: 64.3
These funds will be used towards the construction of a new drinking water pipeline from the CentrePort reservoir to Stony Mountain Institution property line. This is the second phase of the connection...
The residence has been welcoming customers with reduced mobility for many years but in a very limited and punctual way, the center not being entirely adapted to the needs of this clientele. The scope...
BWTP is currently in need of capital repairs and upgrading. The Township advised that they have entered into a design-Build project to retrofit the BWTP with a system capable of Handling sudden and su...
The Salvation Army - Harbour Light CRF contributes to CSC’s corporate priorities and Mission by providing suitable and appropriate care for offenders. This project covers the construction phases of th...
Electrical, plumbing, lightning, stairways, fire suppression systems, bathroom accessibility, flooring, finishings, fixtures, windows and patio doors upgrades as well as the addition of an outdoor gaz...
The JHSVic Princess Ave New Build Project will replace the existing Manchester House Community Residential Facility (CRF) and result in a new, purpose-built CRF. The Victoria Parole Office continues...
The general construction phases of the CRF-re-development of a new facility will involve all adequate and competent labour, supervision, tools, equipment, demolition, site prep work, installations, m...
The design and construction of the CRF-re-development of a new facility includes; architect contract fees and disbursements, structural, electrical, mechanical, landscape, building envelope, interior...
This project continues the construction phases of a new facility that will provide 50 beds. These phases all include adequate and skilled labor, supervision, tools, equipment, site preparation, instal...
A new air handling system is required in order to maintain the space for the twelve non-profit organizations that currently operate out of the building. Failure to correct this problem will lead to th...
John Howard Society of Victoria will replace the existing Manchester House CRF and result in a new, purpose built CRF to meet the needs of aging offenders.
The design and construction of the CRF-re-development of a new facility includes; architect contract fees and disbursements, structural, electrical, mechanical, landscape, building envelope, interior...
Constuction of a new facility to replace existing structure inlcuding 29-units
Construction of a new facility to replace h.e existing structure incling 29 units
Constuction of a new facility at 554 West 21st Avenue to replace existing structure that is outdated. It will be a 29-unit mixed purpose social development.
Design phase of the CRF re-development of a new facility. Includes architect contract fees and disbursement, structural, electrical, mechanical, landscape, building envelop, interior design, acoustic,...
Installation of an air exchange system for the two (2) resident buildings and the two (2) administrative buildings.
This project includes the development and construction of a pedestrian walkway to ensure safe access to Grande Cache Institution (GCI) from the Hamlet of Grande Cache, Alberta (located within the Muni...
Both parties have agreed to make financial contributions for the purposes of enabling the University of Saskatchewan Forensic Branch to continue the research projects and training that supports the ma...
Renovations and major construction is required to underpin foundation, repair exterior walls, roof and floor as a result of the shifting (sinking) of the one side of the building, Scope of work includ...
Upgrade site water infrastructure to provide an improved source of water and a water treatment system, including, drilling a new water well, potable water testing of the new well, purchase and install...
Upgrade site water infrastructure to provide an improved source of water and a water treatment system, including, drilling a new water well, potable water testing of the new well, purchase and install...