TesMan Inc.
$200,000.00 CAD
- Department
- National Research Council Canada
- Recipient country
- Canada
- Fiscal year
- 2024-2025
- Agreement period
- January 1, 2025 – July 2, 2025
- Reference
- nrc-cnrc:172-2024-2025-Q4-1028464
Published purpose
This Project encompasses the design and implementation of the following elements for the commercialized version of the Tunnel Load Master (TLM): the command and control software, and the batch manufacturing engineering model of the fabrication components. This includes the design from concept to production-applicable, TLM matched advanced mine tunneling cycle. This new approach to tunneling in mines, functioning while the personnel are a minimum of 5 meters from the tunnel face throughout the entire cycle, enables the design of a new drill and blast series of tasks to advance the tunnel face forward, far shorter cycle time compared to the industry standard method.
Community tags
Tags are applied by readers, not by this site. One tag per person per record.