Create a modular home production plant in the community of Cambridge Bay where homes can be rapidly built for local housing needs and shipped to other Nunavut communities.
Federal spending by Canadian Northern Economic Development Agency
1,967 records totalling $574,134,443.25 CAD, from official Government of Canada open data.
Embed this chart
Where the money flows
Contracting
$4.7M
across 128 contracts over $10k
59.9%
of contract dollars awarded without competition (93 contracts)
98.2%
of contracts with known bid counts received one bid or fewer (56 reported)
"Without competition" counts solicitation codes TN (non-competitive) and AC (Advance Contract Award Notice). Non-competitive awards are legal and sometimes required; the rate is context, not a judgment.
Planned vs. actual spending
What Parliament authorised this organization to spend versus what it actually spent, across all its votes. Source: Public Accounts of Canada (via GC InfoBase). This covers the organization's entire budget, not just the grants and contracts listed below.
| Fiscal year | Authorised | Spent | Used |
|---|---|---|---|
| 2024-2025 | $81,347,545 | $80,976,370 | 99.5% |
| 2023-2024 | $88,793,848 | $87,358,298 | 98.4% |
| 2022-2023 | $108,741,194 | $105,077,343 | 96.6% |
| 2021-2022 | $91,960,963 | $88,371,514 | 96.1% |
| 2020-2021 | $123,051,655 | $101,219,284 | 82.3% |
| 2019-2020 | $68,522,899 | $67,162,468 | 98.0% |
| 2018-2019 | $50,814,741 | $45,823,015 | 90.2% |
| 2017-2018 | $55,506,700 | $54,420,053 | 98.0% |
| 2016-2017 | $55,823,517 | $53,639,049 | 96.1% |
| 2015-2016 | $51,375,862 | $46,948,420 | 91.4% |
Did it deliver? (2024-2025 results report)
Every department sets measurable performance targets and reports against them. Source: Departmental Results Reports via GC InfoBase — the department's own self-reported scorecard.
6
of 11 targets met
2
targets not met
3
not yet measurable or unavailable
See missed targets
-
% of environmental assessments in the Territories that are completed within the scheduled time frame
Target: — · Actual: 93.0
-
Percentage of environmental assessments in the Territories that are completed within the scheduled time frame.
Target: — · Actual: 93.0
First Kaska Construction LP will purchase and install plant equipment at their Heartland Timber Homes construction facility in Watson Lake.
Conduct targeted scientific research to support Nunavut's fisheries sector. The project will cover a number of strategic gaps in knowledge for the fisheries sector to sustainably expand the fisheries...
Knutsford Ventures Inc will receive a repayable contribution in the amount of $1,200,000 (8% of total project costs) toward a 3-year $15,000,000 project to remodel the existing “Polar Eggs” farm to in...
Black Spruce Education will develop the Black Spruce Education Centre in Norman Wells, NT, through the construction and renovation of facilities to support training, small business incubation, and com...
Construction of a 39 foot inshore fishery research vessel and subsequent fishery research activities
Yukon University support a project centered on program and course delivery in 3 Yukon communities with the intention of capacity building and skills development for local participants.
To conduct fisheries research and training, and increase market access to sealing products and overall awareness for the sealing sector.
Pinnguaq Association (Ampere) will support the final phase of design development for a new 7,222 sq. ft, economic development hub in Iqaluit.
Support the operational requirements needed to administer the Entrepreneurship and Business Development program in the Yukon on CanNor's behalf, under a three year Service Delivery Partner arrangemen...
The Government of Nunavut will complete projects in accordance with Regional Air Transportation Initiative (RATI) terms and conditions to provide support that will help stabilize communities impacted...
Deliver a pan-territorial cohort-based business accelerator program for earlystage Indigenous entrepreneurs. EntrepreNorth will offer an annual, sector-driven business accelerator program which aims t...
Establish the Northern Technician Program and the Northern Remediation Monitoring Program in the Northwest Territories. These programs aim to promote economic growth and environmental remediation in t...
This funding is for the purpose of delivering, on behalf of CanNor, the Entrepreneurship and Business Development (“EBD”) stream of CanNor’s Northern Aboriginal Economic Opportunities Program.
The Recipient, NWT Métis Dene Development Fund (“NWT MDDF” or the “Recipient”), is receiving $766,667 in capital funding and a further $261,200 to cover O&M costs associated with the delivery of EBD p...
Financial support for the operational requirements to administer the Entrepreneurship and Business Development program
For the purpose of delivering, on behalf of CanNor, the Entrepreneurship and Business Development (“EBD”) stream of CanNor’s Northern Aboriginal Economic Opportunities Program. The project will expand...
Funding for the purpose of delivering, on behalf of CanNor, the Entrepreneurship and Business Development stream of CanNor’s Northern Aboriginal Economic Opportunities Program.
Construction of a solar energy facility including solar panel frames, electronic building, installation of panels, upgrade power distribution lines, install step-up transformer, battery storage system...
Establish the Liidlii Kue Tourism Center which will have five new heated cabins, a large meeting room, five tent pads, five wall tent frames, a gazebo, a commercial kitchen, a storage room, a security...
ArchTech will conduct a two year project to build a pre-fabricated modular housing facility in the community of Baker Lake, Nunavut.
North-Wright Airways is receiving a repayable funding from CanNor to support the construction of a hangar facility at the Norman Wells Airport.
Completion of detailed planning and design of an 80 room hotel
Construction of a solar energy facility including solar panel frames, electronic building, installation of panels, upgrade power distribution lines, install step-up transformer, battery storage system...
The Hamlet of Kugaaruk will construct a new six bay service garage. The new garage will replace an old, poorly insulated building that is unsafe for work. The new garage will enable the community to c...