A project to build capacity within the staff in order to provide additional and new training for members/community, as well as fund a series of upgrades, tools, materials and supplies that will signif...
Federal spending by Canadian Northern Economic Development Agency
1,967 records totalling $574,134,443.25 CAD, from official Government of Canada open data.
Embed this chart
Where the money flows
Contracting
$4.7M
across 128 contracts over $10k
59.9%
of contract dollars awarded without competition (93 contracts)
98.2%
of contracts with known bid counts received one bid or fewer (56 reported)
"Without competition" counts solicitation codes TN (non-competitive) and AC (Advance Contract Award Notice). Non-competitive awards are legal and sometimes required; the rate is context, not a judgment.
Planned vs. actual spending
What Parliament authorised this organization to spend versus what it actually spent, across all its votes. Source: Public Accounts of Canada (via GC InfoBase). This covers the organization's entire budget, not just the grants and contracts listed below.
| Fiscal year | Authorised | Spent | Used |
|---|---|---|---|
| 2024-2025 | $81,347,545 | $80,976,370 | 99.5% |
| 2023-2024 | $88,793,848 | $87,358,298 | 98.4% |
| 2022-2023 | $108,741,194 | $105,077,343 | 96.6% |
| 2021-2022 | $91,960,963 | $88,371,514 | 96.1% |
| 2020-2021 | $123,051,655 | $101,219,284 | 82.3% |
| 2019-2020 | $68,522,899 | $67,162,468 | 98.0% |
| 2018-2019 | $50,814,741 | $45,823,015 | 90.2% |
| 2017-2018 | $55,506,700 | $54,420,053 | 98.0% |
| 2016-2017 | $55,823,517 | $53,639,049 | 96.1% |
| 2015-2016 | $51,375,862 | $46,948,420 | 91.4% |
Did it deliver? (2024-2025 results report)
Every department sets measurable performance targets and reports against them. Source: Departmental Results Reports via GC InfoBase — the department's own self-reported scorecard.
6
of 11 targets met
2
targets not met
3
not yet measurable or unavailable
See missed targets
-
% of environmental assessments in the Territories that are completed within the scheduled time frame
Target: — · Actual: 93.0
-
Percentage of environmental assessments in the Territories that are completed within the scheduled time frame.
Target: — · Actual: 93.0
A three-year project to renovate a co-working industrial space that will offer access to industrial equipment, skills training, and business supports for Yellowknife’s business community. The project...
Development of a boutique hotel in Dawson City in a historic building.
A technical study to determine the feasibility of using geothermal heat sources to provide energy for community scale eletrical generation and building heating systems.
Complete the renovation of the Heritage Centre.
Purchase Blue Stone Holdings (BSH) of Watson Lake; a seller of sand, gravel, concrete and related products. Bluestone manufacturers and supplies precast and redi-mix concrete and aggregates from its...
Purchase and install 10 cold storage units and 1 rapid freezing cold storage unit to increase and optimize product processing and capacity.
The proposed project will renovate an existing structure from the old Giant Mine site and repurpose it to preserve the heritage and mining history of Yellowknife. The Centre will facilitate partnershi...
The project will help develop partnerships, programming, and services for new Makerspaces in NWT communities, as well as support on-going project activities.
Yukon University, through the Centre for Northern Innovation in Mining will expand their existing program and grow its ability to provide commercial driver training in communities outside Whitehorse (...
A repayable conribution to complete renovations and upgrade of the unique Takhini Hot Springs property, located just outside Whitehorse, Yukon. Project activities include completion of construction/re...
Support of operational requirements such as wages and administration to deliver the Entrepreneur and Business Development program
Construction of an indoor accessible community gathering space attached to the nine unit Elder’s Complex.
Deliver the Entrepreneurship and Business Development program on CanNor's behalf, under a three year External Delivery Organization agreement.
The Nunavut Community Futures Association (NCFA), an Inuit majority-led not-for-profit, will deliver the Entrepreneurship and Business Development (EBD) program on CanNor's behalf in the Kitikmeot Reg...
supports small and medium-sized territorial businesses operating in one or more of the territories, and which are currently, and expect to continue, operating at a loss as a direct result of economic...
The Yukon College’s Cold Climate Innovation Centre will support the research, prototype development and pilot testing of innovation and clean technology projects, host community workshops to promote a...
The Naha Dehe Development Corporation (NDDC), wholly owned by the Nahanni Butte Dene Band, is receiving $696,000 (80% of total project costs) to complete a two-year $870,000 project. Naha Dehe Develop...
As the Designated Inuit Organization representing the interests of all Inuit in the Kitikmeot region, the Kitikmeot Inuit Association (KitIA) will deliver the Entrepreneurship and Business Development...
The project will support Phase II construction of the Yellowknife Islamic Cultural Centre. This centre will provide Yellowknife's growing Muslim community with a much needed space for cultural enrichm...
Ross River Dena Council (RRDC) will complete detailed architectural and engineering design, for the eventual construction of a modernized general store in Ross River.
Renovation and construction of existing building and cabins which are part of the Sambaa K’e Lakefront Resort. Repairs and construction are needed to ensure that the cabins and installations are suita...
A 1-year extension to an agreement to continue its role in the delivery of the Entrepreneurship and Business Development stream of CanNor’s Northern Aboriginal Economic Opportunities Program (NAEOP) f...
Installation of a Volter biomass system to further the development of a biomass energy system and pilot the first heat and power biomass unit in the Yukon.
Qikiqtaaluk Corporation will obtain and install mapping equipment for the Moses Appaqaq Vessel and a portable mapping equipment system to be used on local vessel's around Nunavut.