St. Leonard's Community Services Inc / Services communautaires de Saint-Léonard Inc.
$97,496.00 CAD
- Department
- Correctional Service of Canada
- Recipient country
- Canada
- Fiscal year
- 2023-2024
- Agreement period
- July 13, 2023 – March 31, 2024
- Reference
- csc-scc:193-2023-2024-Q2-400-75157
Published purpose
This project entails regrading of existing driveway to reduce slope and installation of proper steps to increase staff/client/visitor health and safety when approaching the building (Current driveway slope does not allow for an accessible parking space near the entrance, and instead puts the accessible space on the street making it difficult for those with mobility issues to enter the building due to the significant slope of the driveway). Project includes the installation of a new retaining wall and steps along the side of the driveway with a railing to enhance access for all visitors. Converting first floor washroom to become fully accessible for clients. Remove existing tub and replace with accessible shower unit. Install automatic door operating systems to both exterior entrance and bath entrance door. Enlarge interior door opening to meet current accessibility code requirements.
Community tags
Tags are applied by readers, not by this site. One tag per person per record.