Town of Cobourg
$503,480.00 CAD
- Program
- Active Transportation Fund
- Recipient country
- Canada
- Fiscal year
- 2024-2025
- Agreement period
- July 15, 2024 – March 31, 2026
- Reference
- infc:278-2024-2025-Q2-00056
Published purpose
"4 bundled projects: 1. Replacing a disintegrating wood boardwalk with a new boardwalk with an edge guard to make it fully accessible and safe. The boardwalk connects the marina and Victoria Park/Beach with the west end of Cobourg's residential area and is a very close connection to the downtown. 2. Rehabilitation of a multi-use pathway between Cottesmore Av to Brook Rd N with the addition of new limestone screenings. The path is 550 metres in length and 3 metres wide. Also, the path connects to another proposed project on Brook Rd N (the path connects to another proposed project on Brook Rd N). 3. This project involves the widening of paved shoulders on Brook Rd N from 250m north of King St E to the south side of CN/CPR railway to increase the connectivity for pedestrians and cyclists to the Kerr St trail. The total distance is approximately 250m. 4. Activities involve excavating and installing a multi-use path using limestone screenings as a temporary investment in AT for this section of Kerr St prior to its future build out. The path is 570m in length and 3 metres wide. This is a residential connection that will be fully accessible and safe for use by pedestrians and cyclists."
Community tags
Tags are applied by readers, not by this site. One tag per person per record.