Town of Bridgewater
$20,411,040.00 CAD
- Recipient country
- Canada
- Fiscal year
- 2024-2025
- Agreement period
- February 20, 2025 – March 31, 2033
- Reference
- infc:278-2024-2025-Q4-00120
Published purpose
The Town of Bridgewater DMAF project outlines the investiture of the ten-year Wastewater Master Plan designed to create climate change resiliency and enable continued growth and development as a regional centre through reduced I/I in the wastewater system critical upgrades to pump station and wastewater treatment infrastructure to reduce damage from storms and eliminate combined sewer overflows resulting in an overall reduced risk of critical system failure resulting in sewer backups into homes and untreated sewage discharged into the LaHave River.
In plain English AI-generated
This federal contribution funds the Town of Bridgewater's wastewater infrastructure upgrades and climate resilience measures, including pump station and treatment improvements to reduce storm damage and combined sewer overflows.
Category: Infrastructure Primarily funds activity in Canada
Based on the published description. See how AI categorization works — the linked official record is authoritative.