City of Delta
$7,600,000.00 CAD
- Recipient country
- Canada
- Fiscal year
- 2024-2025
- Agreement period
- January 9, 2025 – March 31, 2033
- Reference
- infc:278-2024-2025-Q4-00157
Published purpose
The increasing rainfall and development creating more stormwater runoff, adding two large pump stations will mitigate flood concerns. An additional 6 cubic metres per second for the Silda area will ensure flood resilience is increased in its area while 84 Street's additional conveyance ability of 2.5 cubic metres per second will improve the area's drainage overall. The additional ability to move up to 8,500 litres of stormwater per second under high tide circumstances is a large boost to Delta's drainage system.
In plain English AI-generated
This federal contribution funds the City of Delta to build two large pump stations and improve stormwater drainage, increasing flood resilience by adding up to 8,500 litres per second of conveyance capacity under high tide conditions.
Category: Infrastructure Primarily funds activity in Canada
Based on the published description. See how AI categorization works — the linked official record is authoritative.