O'Chiese First Nation

$12,650,000.00 CAD

≈ $0.30 for every person in Canada ≈ 162 Canadians' average pay for a year
Department
Department of Housing, Infrastructure and Communities
Program
Disaster Mitigation and Adaptation Fund
Recipient country
Canada
Fiscal year
2024-2025
Agreement period
January 7, 2025 – March 31, 2033
Reference
infc:278-2024-2025-Q4-00160

Published purpose

This project involves the replacement of the Baptiste River Bridge and the realignment and rehabilitation the 500m stretch of roadway on reserve leading up to the bridge. A hydrology analysis conducted in 2023 determined that the current bridge over the Baptiste River is at risk of being overtopped during a 1 in a 100-year event. The freeboard (the low chord of the bridge and the predicted 1 in 100-year water surface elevation of the river at the bridge crossing) is less than the one metre recommended by Alberta Transportation posing huge risk to the Nation in a flooding event. The low freeboard also increases the chances of debris getting caught on the bridge, further damaging the bridge, and potentially leading to overtopping of the bridge if flow is impeded. With only two primary access points into the community it is imperative that the bridge and road be adequately updated to support emergency access to the Nation.

In plain English AI-generated

This project replaces the Baptiste River Bridge and realigns/rehabilitates 500m of roadway on the O'Chiese First Nation reserve to improve flood resilience and ensure emergency access.

Category: Infrastructure Primarily funds activity in Canada

Based on the published description. See how AI categorization works — the linked official record is authoritative.

Community tags

Tags are applied by readers, not by this site. One tag per person per record.

Good value Local impact Needs context Questionable Success story Wasteful
View official source record Imported July 30, 2026 from open.canada.ca Grants & Contributions