City of Notre-Dame-de-l'Île-Perrot
$2,189,952.00 CAD
- Recipient country
- Canada
- Fiscal year
- 2025-2026
- Agreement period
- August 26, 2025 – March 31, 2033
- Reference
- infc:278-2025-2026-Q2-00027
Published purpose
Erosion is threatening the integrity of Boulevard Perrot (Notre-Dame de l'Île-Perrot's main road) and Chemin du Vieux-Moulin in some areas. In some places, only one metre of shoreline remains. The project consists of stabilizing the banks in the most critical areas in order to protect the integrity of these two roads, including the drinking water pipes, the sanitary sewer pipes and the overhead electrical network. In addition, the project will ensure the safety of the citizens living in these areas. Considering that Perrot Boulevard and Vieux-Moulin Road are the only arteries giving access to the residences in their respective sectors, the closure of these sections, temporarily or permanently, would no longer allow citizens to access and leave their homes safely.
Community tags
Tags are applied by readers, not by this site. One tag per person per record.