The design guide will be an extension of the Hamilton Complete Street Design Guide (under development now) to provide best practices and suggested designs for common intersections types in Hamilton.
Federal spending by Department of Housing, Infrastructure and Communities
2,252 records totalling $80,641,788,409.29 CAD, from official Government of Canada open data.
Embed this chart
Where the money flows
Planned vs. actual spending
What Parliament authorised this organization to spend versus what it actually spent, across all its votes. Source: Public Accounts of Canada (via GC InfoBase). This covers the organization's entire budget, not just the grants and contracts listed below.
| Fiscal year | Authorised | Spent | Used |
|---|---|---|---|
| 2024-2025 | $8,458,021,616 | $7,968,878,253 | 94.2% |
| 2023-2024 | $9,951,523,282 | $7,619,725,159 | 76.6% |
| 2022-2023 | $9,381,572,950 | $6,828,959,017 | 72.8% |
| 2021-2022 | $10,710,444,268 | $8,962,080,971 | 83.7% |
| 2020-2021 | $8,040,678,496 | $5,492,387,892 | 68.3% |
| 2019-2020 | $11,147,146,333 | $8,948,867,553 | 80.3% |
| 2018-2019 | $6,707,747,462 | $5,654,251,732 | 84.3% |
| 2017-2018 | $7,154,601,702 | $4,326,297,009 | 60.5% |
| 2016-2017 | $5,349,161,397 | $3,207,766,272 | 60.0% |
| 2015-2016 | $3,762,351,961 | $3,190,441,756 | 84.8% |
Did it deliver? (2024-2025 results report)
Every department sets measurable performance targets and reports against them. Source: Departmental Results Reports via GC InfoBase — the department's own self-reported scorecard.
25
of 35 targets met
7
targets not met
3
not yet measurable or unavailable
See missed targets
-
Percentage of the population living within 500 meters of a public transit stop
Target: — · Actual: 74.6
-
Number of people placed in more stable housing
Target: — · Actual: 16333.0
-
Number of projects considering and using alternative finance procurement models by public sponsors in Canada
Target: — · Actual: 10.0
-
Number of people placed in more stable housing under Reaching Home
Target: — · Actual: 16333.0
-
Homelessness funding through the Veteran Homelessness Program is committed to projects
Target: — · Actual: 99.0
The purpose of this document is to provide guidance on the design of¿protected intersections¿within Ontario municipalities. This Guideline will draw from the best practices in place across Ontario inc...
Charting Common Ground leverages the shared spaces, resources, and interests of school boards and municipalities to develop and adopt an Active Travel Charter in Leduc, Alberta.
The Pedestrian Connectivity Master Plan project will include the development of a sustainable plan to connect new and existing pedestrian and bicycle pathways and trails in Didsbury to increase access...
EnviroCentre, on behalf of the Ottawa Student Transportation Authority, will conduct a feasibility study to assess the conditions for a local implementation plan and rollout of a School Streets Progra...
This work will produce a feasibility study for a 3km Kent Ave bikeway extension. It will connect a major regional east-west network gap between Ontario Street and the Arbutus Greenway.
This research project will take a two-step approach to first evaluate the safety impact of installing high visibility (ladder/zebra style) crosswalk markings at signalized intersections using a before...
As part of the Active Transportation Plan, the City committed to the following action item under the theme of connectivity: Develop a complete and connected bicycle network for all ages and abilities.
Victoria Avenue is a two-lane major collector street connecting many residential neighbourhoods, commercial areas, and park spaces in Saskatoon.
The Active Transportation Street Team will provide in-person, on-site education on the rules of the road and the existing bike network, as well as build support for cycling
The Town of Cochrane’s policy development project through the ATF planning and design stream will serve as the foundation for future pathway development throughout our community.
The City of Coquitlam is applying for the "Walkway Planning: Staircase Inventory and Condition Assessment Study" under the 'planning project' category to undertake an analysis of current staircase ass...
The Town of Digby does not currently have an Active Transportation Plan. The plan is needed to identify and prioritize those areas of current active transportation infrastructure that require upgradi...
This planning and design project will produce a tender-ready design for a safer multi-use overpass that can proceed to construction as soon as a funding source becomes available.
This project will update and refine the existing out-dated Active Transportation Strategy to generate a prioritized project list for long-term capital planning.
The Town of Peace River does not have a public transit system. Current planning documents acknowledge the importance of improving walkability and active transportation links but do not provide clear d...
The City of Mission is a partner municipality in the Experience the Fraser (ETF) Trail project that is creating ~500 km of pathway weaving together communities & points of interest along the Fraser Ri...
Through the Parks & Trails Active Mobility Study, & a review of an existing draft Parks & Trails Masterplan, the NRRM is investing in improvements to community well-being. It is anticipated that impro...
The “West Winnipeg Perimeter (PTH 100) Active Transportation Crossing (MB) Project” will establish a plan for the construction of a safe and sustainable crossing between the Winnipeg Harte Trail and t...
The Bud Miller All Seasons Park Master Plan will provide detailed information on possibilities to improve active transportation, increase accessible recreation opportunities for all demographics inclu...
A cohesive wayfinding strategy is identified in several master plans: the 2013 Cycling Master Plan, the 2017 Active Transportation Network, and the 2021 Guelph Trail Master Plan.
The planning project will do the following: Accommodate all roadway users with comprehensive street design measures such as “complete streets,” including sidewalks, bicycle lanes, and share-the-road s...
This project will define a plan that will improve the East Beach Trail on Haida Gwaii to open this active transportation experience to more people in a culturally and environmentally sustainable way.
The Village of Fraser Lake is a rural community located in Northern BC. Our community hosts 1100 residents, and is the largest and only community in the Regional District of Bulkley Nechako Area "D".
The project will develop a Wayfinding guideline and will be seeking the services of a third party consultant to engage in the research, planning and development process.